“Replacement Systems for Northeast Car Manufacturer”
In 2018 RFe was contracted by Nissan to carry out the design and installation of their new site water supplies. Works comprised of installing a new pump house & tank, including builders work/tank bases, underground mains feed for the tank infill and delivery supply to the existing site ring main.
Following on from this successful turn-key project, in 2019 RFe carried out the removal of a 30 year old 1300m3 sprinkler tank and replaced it with a new FM approved sprinkler tank in a fast turnaround programme.
The site now has 2 fully operational pump house/tank locations to give greater resilience for this ever-growing manufacturer.